Answers · Perth

How long does a renovation take in Perth?

Short answer

With CIER Group Pty Ltd (BC104128, BP104444), kitchen and bathroom renovations typically take about 1–6 weeks on site, load-bearing wall removal 1–3 weeks on site (or about 3–8 weeks including engineer and permit), and extensions 12–20 weeks to build. We work across Perth metro, with a focus on Melville, Fremantle, Cockburn, Canning and the southern suburbs, with kitchens from $35,000 incl. GST, bathrooms from $20,000 incl. GST and extensions from about $120,000 incl. GST.

Indicative pricing only. Final pricing is confirmed once the full scope is set and, where needed, after engineering detail. Larger or structural projects may need a more detailed paid consultation after the free initial walk-through.

Typical timeframes

WorkTypical timeIndicative price
Non-load-bearing timber stud wall removal1–3 daysfrom $3,500 incl. GST
Non-load-bearing brick wall removalTimeframe confirmed after the site walk-throughfrom $5,000 incl. GST
Load-bearing wall removal1–3 weeks on site, or about 3–8 weeks including engineer and permitfrom $8,000 incl. GST (timber), from $12,000 incl. GST (brick with steel beam)
Bathroomabout 1–6 weeks on sitefrom $20,000 incl. GST
Kitchenabout 1–6 weeks on sitefrom $35,000 incl. GST
Extension12–20 weeks to build$3,500–$4,500 per m² incl. GST, from about $120,000 incl. GST

Indicative pricing only. Final pricing is confirmed once the full scope is set and, where needed, after engineering detail. Larger or structural projects may need a more detailed paid consultation after the free initial walk-through.

What happens before work starts

Where the structure changes, we arrange the structural engineer and the building permit before work starts. In WA the permit authority has 10 business days (certified) or 25 business days (uncertified) to decide a permit application.

Service pages: renovations · bathrooms · extensions · Planner: plan your project

Questions

How long does a bathroom renovation take?

About 1–6 weeks on site.

How long does a kitchen renovation take?

About 1–6 weeks on site.

How long does an extension take to build?

12–20 weeks to build.

Does the timeframe include permits?

The on-site times don't. For load-bearing wall removal, allow about 3–8 weeks in total including engineer and permit.

Next steps

The free walk-through is to look at the site and talk through the scope. Pricing follows once the scope is set. We reply within 24 hours. CIER Group Pty Ltd · Registered building contractor BC104128 · Building practitioner BP104444 · ★ 5.0 from 11 Google reviews · Kardinya WA 6163 · 0402 452 797

Book a free site consult

Tell us the suburb, the property type and the work you're planning. We'll get back to you within 24 hours to arrange a free walk-through of the site. The free walk-through is to look at the site and talk through the scope. Pricing follows once the scope is set.

Renovated open-plan living area at golden hour

5.0

★★★★★

from 11 Google reviews

Call 0402 452 797Free site consult